Committee on Materials and Pavements


AASHTO Liaisons
Casey Soneira, Program Manager for Engineering
csoneira@aashto.org
Chad Clawson, AASHTO Engineering Fellow
cclawson@aashto.org

Mid-Year Webinars

2017-2018 Mid-Year Meetings 

Minutes by Technical Subcommittee

TS 1a – Soil and Unbound Recycled Materials-did not conduct a mid-year meeting 
TS 1b – Geotechnical Exploration, Instrumentation, Stabilization and Field Testing
TS 1c – Aggregates
TS 2a – Emulsified Asphalts
TS 2b – Liquid Asphalt
TS 2c – Asphalt-Aggregate Mixtures
TS 2d – Proportioning of Asphalt-Aggregate Mixtures
TS 3a – Hydraulic Cement and Lime 
TS 3b – Fresh Concrete –did not conduct a mid-year meeting 
TS 3c – Hardened Concrete
TS 4a – Concrete Drainage Structures
TS 4b – Flexible and Metallic Pipe
TS 4c – Markings and Coatings
TS 4d – Safety Devices
TS 4e – Joints, Bearings, and Geosynthetics
TS 4f – Metals
TS 5a – Pavement Measurement-did not conduct a mid-year meeting 
TS 5b – Bridge and Pavement Preservation
TS 5c – Quality Ass​urance and Environmental 

TS 5d- Pavement Design-did not conduct a mid-year meeting 
AR- AASHTO re:source Administrative Task Group

2017 Mid-Year Meetings

Minutes by Technical Section

TS 1a – Soil and Unbound Recycled Materials
TS 1b – Geotechnical Exploration, Instrumentation, Stabilization and Field Testing 
TS 1c – Aggregates
TS 2a – Emulsified Asphalts 
TS 2b – Liquid Asphalt
TS 2c – Asphalt-Aggregate Mixtures 
TS 2d – Proportioning of Asphalt-Aggregate Mixtures
TS 3a – Hydraulic Cement and Lime 
TS 3b – Fresh Concrete 
TS 3c – Hardened Concrete
TS 4a – Concrete Drainage Structures 
TS 4b – Flexible and Metallic Pipe
TS 4c – Markings and Coatings
TS 4d – Safety Devices- did not conduct a mid-year meeting
TS 4e – Joints, Bearings, and Geosynthetics
TS 4f – Metals
TS 5a – Pavement Measurement- did not conduct a mid-year meeting 
TS 5b – Bridge and Pavement Preservation
TS 5c – Quality Ass​urance and Environmental
AR- AASHTO re:source Administrative Task Group

2016 Mid-Year Meetings

Minutes by Technical Section

TS 1a – Soil and Unbound Recycled Materials Test Methods
TS 1b – Subsurface Exploration, Soil Instrumentation, Soil Stabilization, and Field Testing of Soils- did not conduct a mid-year meeting
TS 1c – Aggregate Materials
TS 2a – Emulsified Asphalts
TS 2b – Asphalts
TS 2d – Proportioning of Asphalt-Aggregate Mixes
TS 3b – Concrete Materials and Fresh Concrete Properties
TS 3c – Hardened Concrete
TS 4a – Rigid Pipe
TS 4b – Flexible and Metallic Pipe 
TS 4c- Coatings, Paints, Preservatives, Bonding Agents and Traffic Markings- did not conduct a mid-year meeting
TS 4d – Safety Devices (Guardrail, Fencing, Attenuators, Signs and Signals) 
TS 4e – Joint Materials, Wood, Bridge Bearings, Geosynthetics and Insulation Board
TS 4f/g – Structural Components and Concrete Reinforcement 
TS 4h – Castin​gs and Non-Ferrious Metals
TS 5a – Pavement Measurement Technologies – did not conduct a mid-year meeting 
TS 5b – Environmental Quality Measurements 
TS 5c – Quality Ass​urance, Data Evaluation and Acceptance Plans

2015 Mid-Year Meetings

Minutes by Technical Section

TS 1a – Soil and Unbound Recycled Materials Test Methods
TS 1b – Subsurface Exploration, Soil Instrumentation, Soil Stabilization, and Field Testing of Soils
TS 1c – Aggregate Materials – did not conduct a mid-year meeting
TS 2a – Emulsified Asphalts
TS 2b – Asphalts 
TS 2d – Proportioning of Asphalt-Aggregate Mixes
TS 3b – Concrete Materials and Fresh Concrete Properties
TS 3a – Hydraulic Cement and Lime
TS 4b – Flexible and Metallic Pipe
TS 4c – Coatings, Paints, Preservatives, Bonding Agents and Traffic Markings
TS 4d – Safety Devices (Guardrail, Fencing, Attenuators, Signs and Signals)
TS 4e – Joint Materials, Wood, Bridge Bearings, Geosynthetics and Insulation Board
TS 5b – Environmental Quality Measurements
TS 4f/g – Structural Components and Concrete Reinforcement
TS 4h – Castings and Non-Ferrious Metals
TS 5a – Pavement Measurement Technologies – did not conduct a mid-year meeting
TS 5c – Quality Assurance, Data Evaluation and Acceptance Plans – did not conduct a mid-year meeting

2014 Mid-Year Meetings

Minutes by Technical Section